LP-STD-001 | SYSTEM AUTHORIZATION
90-Day Compliance Infrastructure Installation
"For carriers who want the system installed correctly the first time, with expert verification at each phase."
NO PAYMENT AT THIS STEP
WHAT MOST NEW CARRIERS DO
WHAT THE STANDARD INSTALLS
LP-CURR-001 | THE INSTALLATION SEQUENCE
LP-MOD-G0
Ground 0 — Orientation Foundation
The regulatory framework and what the 90-day window means for your authority.
6 lessonsAUTHORITY: 49 CFR § 387
LP-MOD-01
Business & Authority Setup
Make sure every federal filing is active and correct before operations begin.
8 lessonsAUTHORITY: 49 CFR § 391
LP-MOD-02
Driver Qualification System
Build a complete, CFR-compliant file for every driver before dispatch.
10 lessonsAUTHORITY: 49 CFR § 382
LP-MOD-03
Drug & Alcohol Compliance
Get your federal drug testing program set up before your first load.
8 lessonsAUTHORITY: 49 CFR § 395
LP-MOD-04
Hours of Service & Dispatch
Configure your ELD and build dispatch records that hold under inspection.
7 lessonsAUTHORITY: 49 CFR § 396
LP-MOD-05
Preventive Maintenance & Vehicle Files
Unit files and maintenance records that prove road-legal status.
8 lessonsAUTHORITY: 49 CFR § 387
LP-MOD-06
Insurance & Authority Continuity
Verify insurance filings are actually active — not just assumed filed.
5 lessonsAUTHORITY: 49 CFR § 395
LP-MOD-07
Post-Failure Recovery
45-day correction sequence if you receive a Conditional rating.
VariableAUTHORITY: 49 CFR § 391
LP-MOD-08
ELD Compliance
Extended ELD configuration and compliance audit preparation.
COMING COHORT 2LP-MOD-09
Hazmat Decisions
Hazmat transportation eligibility, registration, and documentation requirements.
COMING COHORT 2LP-VRF-001 | STATION CUSTODIAN VERIFICATION
Your implementation is verified by the Station Custodian at five critical milestones — not auto-graded, not AI-checked.
CHECKPOINT 1 — Authority Foundation
USDOT/MC verified, insurance confirmed, BOC-3 filed
END OF WEEK 1
CHECKPOINT 2 — Driver Guard Installation
DQ Files audit-ready for all active drivers
END OF WEEK 4
CHECKPOINT 3 — Drug Guard Installation
D&A program compliant, consortium enrolled
END OF WEEK 7
CHECKPOINT 4 — Log & Shop Guard Installation
ELD registered, maintenance system operational
END OF WEEK 11
CHECKPOINT 5 — Integrity Audit
Full system verification → Verified Registry ID issued
END OF WEEK 13
"Each checkpoint is manually verified by Vince Lawrence before you proceed. This is not a course you click through — it's a system that gets installed correctly or not at all."
LP-VRF REGISTRY
Carriers who complete all five checkpoints receive a Verified Registry ID — confirming that the compliance infrastructure was installed under the Standard.
LP-FIN-001 | AUTHORITY PROTECTION FINANCING
SINGLE AUTHORIZATION
$2,500
Full system access at enrollment
Save $500 vs. phased authorization
PHASED AUTHORIZATION
$1,500 today
+ $1,500 at Day 45 · $3,000 total
PHASE 1 — $1,500 AT ENROLLMENT
PHASE 2 — $1,500 AT DAY 45
$500 more than single authorization
LP-STD-FAQ | COMMON QUESTIONS
LP-STD-001 | ENROLLMENT
Admission is reviewed before enrollment is confirmed. The LaunchPath Standard is limited to 10 carriers per cohort.
NO PAYMENT AT THIS STEP · FIRST COHORT · 10 CARRIERS MAX